| Inspection | Scheduled | Result |
|---|---|---|
Foundation Foundation pour meets specifications. Rebar spacing verified. | 2025-12-09 | Passed |
Framing All structural members per plan. Shear wall nailing confirmed. | 2026-01-24 | Passed |
Electrical Rough-In Wiring, boxes, and panel meet NEC requirements. | 2026-02-14 | Passed |
Plumbing Rough-In Master bath drain slope insufficient. Correction required before re-inspection. | 2026-02-18 | Failed |
Plumbing Rough-In (Re-inspection) | 2026-02-25 | Scheduled |
Mechanical (HVAC) | 2026-03-20 | Scheduled |
Insulation | — | Not Submitted |